Thursday, April 25, 2024

PMC Home

Case Studies

DescriptionIndustryCategoryDocument
Industrial Engineering Studies Reveal $4M SavingsAutomotiveWork MeasurementCase Study 0189-Automaker A.pdf
Supply Chain Optimization Improves Service LevelsAutomotiveSimulation, OptimizationCase Study 0126-Automaker B.pdf
Hospital Capacity Analysis Helps Validate Architect's Master PlanHealthcareSimulation, Capacity AnalysisCase Study 0213-Hospital Master Plan Validation.pdf
Capacity Analysis Enables Right-sizing InitiativesAerospace & DefenseSimulation Modeling, SchedulingCase Study 0215-Capacity Analysis.pdf
Lean and Six Sigma Lead to Process ImprovementHealthcareWork Measurement, Lean and Six Sigma, Theory of ConstraintsCase Study 0209-Hospital B.pdf
Aircraft Assembly Productivity ImprovementAerospace & DefenseSimulationCase Study 0216-Aerospace.pdf
Lean & Six Sigma Improves Construction ProcessAECLean and six sigma, work measurementCase Study 0223-Refinery.pdf
Simulation and TOC Validates Steel Mill CapacityIndustrial ManufacturingSimulation, Theory of Constraints, Manufacturing ProductivityCase Study 0217-Steel.pdf
Material Handling Study Saves Over $900KIndustrial ManufacturingSimulation, Theory of Constraints, Material HandlingCase Study 0151-Foundry Material Handling.pdf
PLM Assessments Help Define RoadmapIndustrial ManufacturingEngineering Productivity, PLM, Digital EngineeringCase Study 0218-Engineered Products Company.pdf

Simulation Study for a Multinational Conglomerate

Industrial EngineeringSimulation, Manufacturing ProductivityCase Study 1801-Steel Assembly.pdf
Home             About                                        Contact             Sitemap


                   North Carolina Disclaimer: PMC will not offer any of its engineering and land surveying services in North Carolina unless it provides such services directly or through subcontractors with special certifications required by the NC State.                  
Copyright © 2004-2019 Production Modeling Corp.